
Rio Stone field guide
Delivery access and placement planning
Convert a site address into a verified truck route, safe unloading zone, placement instruction, and contingency before dispatch.
A useful material request starts with a clear measurement, a defined use, and honest expectations about what still needs confirmation.
Survey from public road to unload point
Walk the route and record the narrowest usable width, vertical clearance, gate opening, turn radius, grade, cross-slope, surface, shoulders, bridge or culvert, wires, branches, roofs, parked vehicles, and reversing distance. Include approach direction and a safe place to stop. Satellite images are not current enough to replace a field survey.
Identify hidden and changing hazards
Mark septic systems, irrigation, shallow utilities, vaults, recent trenches, soft fill, tree roots, retaining edges, wet ground, overhead service drops, pedestrians, pets, school or business traffic, and neighboring access. Rain, construction, parked equipment, deliveries, or landscape changes can invalidate a prior plan. Update Rio before dispatch rather than asking a driver to improvise onsite.
Choose and mark the placement zone
The pile or pallet area should be firm, level enough for the unloading method, reachable without unsafe maneuvering, and clear of drains, slopes, doors, utilities, structures, public right-of-way, and work that needs access. Consider runoff, staining, contamination, material separation, cleanup, tarps, dust, and how the crew will move material from the pile.
Set decision authority and fallback
Name an adult site contact who understands the approved route and placement. Confirm whether unloading is dump, pallet, forklift, or another method and what the quoted scope excludes. The driver must be able to stop when clearance, ground, people, weather, equipment, or placement differs. Agree in advance how a curbside alternative, smaller vehicle, return, or reschedule will be handled.
Before requesting pricing
- Measure route width, height, turning space, slope, cross-slope, surface capacity, gates, culverts, and overhead hazards.
- Choose a lawful, stable placement area that protects drains, utilities, structures, paving, landscaping, traffic, and emergency access.
- Provide an onsite contact, current photos, marked route, weather check, unloading limits, and an agreed stop-or-reschedule plan.
Frequently asked questions
Can a delivery truck drive over my driveway?
Only after vehicle, surface, subgrade, slope, clearance, turning, underground features, and owner authorization are reviewed. Appearance alone does not prove capacity.
Can the driver dump exactly where I point?
Only if the location and maneuver are within the confirmed service scope and safe. The driver may select a safer alternative or stop.
When should I send site photos?
Send current wide and close views before scheduling, then report any weather, construction, parking, gate, wire, or ground change before dispatch.