Navigation menuRio Stone Building Materials Inc.
Build a quote
951-849-5346

2387 W Lincoln St, Banning, CA 92220

Sourcing catalog

Class II Road Base

Explore Class II Road Base, a construction aggregate option available for project quotes through Rio Stone. Compare 6 listed configurations to identify the dimensions, package, or specification that fits your project. Confirm the current lot's color, gradation, unit, price, and availability with Rio Stone before ordering.

Quote first · availability to be confirmedRequest price & availability

Rio Stone confirms the variant, unit, quantity, price, availability, and timing before an order is placed.

weight configuration
Call 951-849-5346

Catalog facts

What is known—and what still needs confirmation.

Specifications appear only when their source and connection to this product are documented.

Request unit
weight configuration
Variants
6
Color
Natural grey to tan aggregate
Geology
Well graded crushed aggregate base, 3/4" minus
Product uses
Base rock under pavers and flagstone; Base under decomposed granite pathways; Driveways, parking pads and access roads; Aggregate base for hardscape construction; Compacted sub base for slabs and footings;
Public category
Construction Aggregate
Department
Rock, Gravel & Aggregates
Listed configurations
6

Description and selection guidance

Explore Class II Road Base, a construction aggregate option available for project quotes through Rio Stone.

Compare 6 listed configurations to identify the dimensions, package, or specification that fits your project.

Confirm the current lot's color, gradation, unit, price, and availability with Rio Stone before ordering.

Uses to discuss

  • Landscape beds, paths, and hardscape areas where the selected grading and finish suit the design.
  • Material comparisons and quantity planning for residential or commercial site work.

What to confirm

  • Confirm gradation, compaction needs, installation depth, and local engineering requirements before use.

Measurement & terms

Estimate cubic volume

Measure each area and planned compacted depth separately. The calculator returns cubic volume only; Rio must confirm compaction, waste, sale unit, and any weight conversion because no verified density is published for this item.

Open the calculator

Also listed or discussed as

  • Class II Road Base
  • Class II Road Base Construction Aggregate
  • road base
  • base material
  • construction aggregate

Before requesting a quote

Bring the details that change the answer.

  1. Product and variantSave the exact name, size, finish, or option.
  2. Quantity and useShare measurements and how the material will be used.
  3. Pickup or deliveryFor delivery, include the address, access, and desired timing.

Pickup or delivery

Plan the movement, not only the material.

For pickup, confirm unit or load dimensions and weight, legal vehicle or trailer capacity, loading method, and securement. For delivery, share the ZIP code, access width and grade, turns, gates, overhead lines, unloading surface, placement point, and timing. Rio confirms the available method before dispatch.

Useful questions

Before requesting Class II Road Base

Are price and availability confirmed?

No. This page starts a sourcing conversation. Rio must confirm the variant, quantity, price, availability, and timing before an order.

How do I calculate a useful quantity?

Measure each area and planned compacted depth separately. The calculator returns cubic volume only; Rio must confirm compaction, waste, sale unit, and any weight conversion because no verified density is published for this item.

Will the material match the photo?

Do not assume it will. Review the image-truth label, caption, and any credit. Natural materials and current lots can vary; request a current-lot check or sample when appearance is decisive.

Compare

View department

Quote first

Nothing is purchased on this page.

Your quote list starts a human review. Rio Stone confirms the details before any commitment.

Your privacy choices

Optional analytics helps us understand which materials and tools people use. It stays off unless you allow it. Your quote list and form draft work either way.

Currently off